Example design ABR (in chain of settling tank, anaerobic filter, maturation pond and drying bed)

Author:
BRAC
Example design ABR (in chain of settling tank, anaerobic filter, maturation pond and drying bed)

Please note that this document has been developed for a very specific local context. Hence it cannot be generalised and always needs further contextualisation. It may serve as inspiration and as a supporting document to inform planning and decision making as a complement to, not a substitute for, sound professional judgement.